Termite Control Calculator

Frequently asked

What is the difference between pre and post construction termite treatment?

Pre-construction treatment is done before the slab is laid, applying chemical to the soil. Post-construction is done after the building is complete, involving drilling and injecting chemicals around the foundation.

How much does termite treatment cost per sqft?

Pre-construction termite treatment costs ₹10–15 per sqft, post-construction ₹8–12 per sqft. Baiting systems are more expensive. This calculator uses these rates.

How long does termite treatment warranty last?

Standard warranty is 3–5 years, extendable up to 10 years. This calculator adds a warranty line item based on years selected.

Which related calculators pair well with the Termite Control Calculator?

People doing termite treatment often also need General Pest Control Calculator. Each is free and quotation-ready.